Koderma Thermal Power Station of DVC achieves 100% PLF
The Koderma Thermal Power Station (KTPS) of DVC achieved a PLF of 100% on May 14 2020. The power station has an installed capacity of 1000 MW (2X500 MW) and is located in the State of Jharkhand. This operational excellence has come in the midst of the pandemic where there is a nationwide lockdown. I
The Koderma Thermal Power Station (KTPS) of DVC achieved a PLF of 100% on May 14 2020. The power station has an installed capacity of 1000 MW (2X500 MW) and is located in the State of Jharkhand. This operational excellence has come in the midst of the pandemic where there is a nationwide lockdown. In spite of the difficult circumstances, DVC employees after adopting necessary health precautions have been working 24x7 to ensure sustained supply of power to the nation. As part of the strong CSR culture, DVC employees are continuously extending their assistance by distributing ration, drinking water, masks and sanitizers to the nearby villages & communities in the vicinity of its power stations and especially to the migrant workers.

Comments (0)
No comments yet. Be the first.